Project:
WRA Combined Sewer Solids Separation Facility
Consultant:
HDR, Inc.
Contractor:
Rice Lake Construction Group
Status:
Project Completed
Construction Start Date:
10/1/2010
Construction Completion Date:
9/1/2014
Design Cost:
$6,541,200.00
Construction Cost:
$41,813,121.00
Project Description:

The work to be performed under the Contract Documents consists of the construction of above and below grade portions of the main facility, CSO control building, three (3) retention treatment basins, dechlorination building, river outfall, two (2) standby power facilities, and associated piping, electrical and instrumentation components for the Des Moines Metropolitan Wastewater Reclamation Authority, 3000 Vandalia Road, Des Moines, Iowa.

Project Update:

The project is complete.

Click to enlarge and view a slideshow of all images

  • WRA CSSSF Rendering
    WRA CSSSF Rendering
  • WRA CSSSF Rendering
    WRA CSSSF Rendering
  • WRA CSSSF Rendering
    WRA CSSSF Rendering
  • July 2011 Aerial Photo Looking North
    July 2011 Aerial Photo Looking North
  • July 2011 Aerial Photo Looking South
    July 2011 Aerial Photo Looking South
  • March 2012 Aerial
    March 2012 Aerial
  • March 2012 Aerial (2)
    March 2012 Aerial (2)